Interiors are handed over with keys and a final clean. What is often missing is the record: which laminate, which paint shade, which hinge, where the wires run. Years later, when a shutter is damaged or a wall needs repainting, those details are the difference between an exact match and a near-miss. Ask for them at handover, while everyone still knows.
Which Documents Should You Ask For?
| Document | Why it helps later |
|---|---|
| Finish schedule | Laminate, veneer, acrylic and PU codes by unit, for matching replacements |
| Board specification | Board type and grade by unit |
| Hardware list | Hinge, runner, handle and mechanism models |
| Paint schedule | Brand, product and shade code per room |
| As-built drawings | Final sizes of every unit |
| Electrical layout | Where wires and conduits run, to drill safely |
| Appliance manuals and invoices | Servicing and registration with the maker |
| Care guidance | Cleaning and maintenance for each finish |
| Contacts | Who to call for each trade |
Why Do Finish Codes Matter So Much?
Because laminates and paints come in thousands of similar shades. A replacement shutter or a repainted wall that is close but not identical stands out. With the exact code, a supplier can usually match it, or tell you if it has been discontinued so you can plan.
Why Keep an Electrical Layout?
So nobody drills into a hidden wire when hanging art, a TV or shelves. A photo of each wall before painting, showing conduit routes, is a simple version. Our guide to wall decor covers drilling safely.
Why Do These Records Matter for Rental Flats?
Because repairs between tenancies need quick, matched parts. Our guides to refreshing between tenants and tenant damage rely on these records.
How Should the Records Be Kept?
Digitally, in one folder: photos, PDFs and a simple list. Keep a small offcut of each laminate and a little leftover paint, labelled, if there is storage space. Share the folder with anyone who manages the flat.
When Should You Ask for Handover Documents?
At the start, so the firm knows to prepare them, and again at handover before the final payment. Gunmala Interiors provides a finish and hardware schedule with every project. See our final payment checklist.
Frequently Asked Questions
What documents should I get after interior work?
A finish schedule with codes, board specification, hardware list, paint schedule, as-built drawings, electrical layout, appliance manuals, care guidance and contacts.
Why do I need laminate codes?
To match a replacement shutter or panel exactly later. Similar shades are easy to confuse without the code.
Why keep an electrical layout?
To avoid drilling into hidden wires when fixing TVs, shelves or art. Photos of walls before painting can serve as a simple layout.
Should I keep leftover paint and laminate?
A small labelled offcut and some leftover paint help with touch-ups and matching, if you have space.
Why are handover documents important for rentals?
They make quick, matched repairs possible between tenancies and help settle condition questions.
When should I ask for handover documents?
At the start, so the firm prepares them, and at handover before the final payment.
How should I store interior records?
Digitally, in one shared folder with photos, PDFs and a simple list.
Does Gunmala Interiors provide handover documents?
Yes. We provide a finish and hardware schedule with every project.
Key Takeaways
- Ask for finish, hardware and paint codes at handover.
- Keep an electrical layout or wall photos before painting.
- Store everything digitally in one folder.
- Keep small offcuts and leftover paint if possible.
- Request documents at the start and at handover.