The final payment is the last moment you have real leverage to get finishing work done properly. Before releasing it, walk every room with the specification in hand and check what was delivered, not just what it looks like. Most snags are small and quick to fix, as long as they are found and written down before the money changes hands.
How Should the Handover Inspection Be Done?
- In daylight, with all lights also switched on
- With the quotation and specification in hand
- Opening every door and drawer, not sampling
- With a torch held flat against surfaces to show unevenness
- Writing every snag with a photo and location
What Should Be Checked on Woodwork?
| Check | Look for |
|---|---|
| Doors | Even gaps, aligned tops, close fully, soft-close working |
| Drawers | Full extension, smooth, level, soft-close |
| Edges | Edge banding on every edge, no lifting or gaps |
| Surfaces | No scratches, chips or bubbles in laminate |
| Fixing | Units fixed to walls, no wobble |
| Hardware | Brand and model as specified |
| Filler panels | Gaps to walls closed neatly |
Our guide to telling good woodwork from bad covers each check in detail.
What Should Be Checked in the Kitchen?
- Counter level, seams tight and away from the sink
- Sink and hob cut-outs clean, sealed
- No leaks under the sink after running water
- Under-cabinet lights working along the full run
- Chimney duct sealed and working
What Should Be Checked on Ceilings and Paint?
- No visible joints or cracks in the false ceiling
- Cove lights continuous, without dark gaps
- Access to LED drivers as agreed
- Even paint colour and sheen under side light
- Clean cut lines at ceilings, woodwork and switch plates
What Should Be Checked on Electrical Points?
Every switch, socket and light working, switches controlling the right lights, two-way switches working from both ends, and points positioned as drawn. Test sockets with a phone charger.
What Else Should Be Complete?
- Final cleaning, including inside drawers and tops of units
- Debris removed from the flat and common areas
- Handover documents: finish codes, hardware models, care guidance
Our guide to handover documents lists what to ask for.
When Should the Final Payment Be Released?
After the snag list is agreed in writing and the items are closed, or with a clear agreement on any items that need parts ordered. That is fair to both sides and is how a well-structured payment schedule works. Our guide to reading a quotation covers payment terms.
Frequently Asked Questions
What should I check before the final interior payment?
Every door and drawer, edges, surfaces, fixing, hardware models, filler panels, kitchen counter and sink, ceiling and paint finish, electrical points and final cleaning, against the specification.
How do I inspect woodwork at handover?
In daylight and with lights on, opening every door and drawer, using a torch held flat to show unevenness, and photographing every snag.
What is a snag list?
A written list of defects and unfinished items found at handover, with locations and photos, to be fixed before the final payment.
How do I check the kitchen at handover?
Check the counter is level with tight seams, cut-outs are clean and sealed, there are no leaks under the sink, and lights and chimney work.
How do I check paint and ceilings?
Look for joints or cracks in the ceiling, continuous cove lighting, driver access, and even colour and sheen under side light.
When should the final payment be made?
After the snag list is agreed in writing and closed, or with a clear agreement on items awaiting parts.
Should I check hardware brands at handover?
Yes. Check that hinges, runners and handles match the brand and model on the specification.
What documents should I get at handover?
Finish codes, hardware models and care guidance, so repairs and replacements can match later.
Key Takeaways
- The final payment is your leverage; inspect before releasing it.
- Check every door and drawer against the specification.
- Use a torch held flat to reveal unevenness.
- Photograph and list every snag.
- Release payment once the snag list is closed.
See our guide to telling good woodwork from bad, or book a site visit.