Most surprises in an interior project were written into the quotation from the start. They sit in the unit of measurement, in a line marked "as per actuals", in a provisional allowance, or in an exclusion nobody read. None of these is a trick in itself. Each is a place where the final bill can move, and reading a quotation well means finding every one of them before you sign.

What Are the Parts of an Interior Quotation?

A complete interior quotation has six parts. If one is missing, that is the first question to ask.

PartWhat it should tell you
Line itemsEach unit or task, its size, unit of measurement, rate and amount
SpecificationBoard, finish, hardware and edge banding for each unit
Variable itemsAnything priced "as per actuals" or as a provisional allowance
ExclusionsWhat is not included, written out
TaxWhether tax is included in the rates or added on top
TermsPayment schedule, timeline, validity and how changes are handled

The specification part has its own guide: what a woodwork quotation must say, line by line. This guide covers everything around it.

How Are Interior Items Measured, and Why Does It Matter?

Because the same unit can be measured in different ways, and the method changes the total. The common methods are:

  • Per square foot of shutter or front area. Width times height of the unit as you see it. Common for wardrobes and kitchen cabinets
  • Per running foot. Length only, usually for kitchen base and wall units or countertops
  • Per unit or lump sum. A single price for an item, such as a TV unit or a pooja unit
  • Per square foot of floor or ceiling area. Used for false ceilings and painting

Two things to check. First, that every item has its measured size written next to it, so you can verify it on site. Second, when comparing two quotations, that they use the same method for the same item. A kitchen quoted per running foot and another quoted per square foot cannot be compared until one is converted.

Also check whether lofts are measured separately or included in the main unit, and whether internal drawers and accessories are inside the unit rate or listed as extras.

What Does "As Per Actuals" Mean in an Interior Quote?

It means the item will be charged at whatever it actually costs or measures once the work is done, rather than at a fixed amount agreed now. It is used where the quantity genuinely cannot be known in advance.

Some uses are reasonable. The exact length of electrical wiring for a new point, the area of wall needing extra putty, or debris removal on a job with unknown demolition can all be hard to fix in advance. Other uses are not reasonable, because the quantity can be measured before the work begins: the size of a wardrobe, the running length of a kitchen, the area of a ceiling.

For every "as per actuals" line, ask three things:

  1. Why can this not be fixed now?
  2. What rate will be applied, so only the quantity varies?
  3. What is the expected range, and will you be told before it is exceeded?

A quotation with many "as per actuals" lines is a quotation where the firm has not done the measuring. That is worth knowing before you sign, not after.

What Is a Provisional Sum or Allowance?

A placeholder amount for something not yet chosen, such as tiles, light fittings, handles or a countertop you will select later. The quotation includes an amount, and the final bill is adjusted up or down when you make your choice.

Allowances are useful because they let a quotation be complete before every choice is made. The risk is an allowance set unrealistically low, which makes the total look attractive and moves the real cost into later decisions. Ask what the allowance would buy: show me a handle or a light fitting at this amount. If nothing you would accept falls within it, the allowance is not realistic.

Where Do Hidden Charges Usually Sit?

Rarely in a single dramatic line. More often in small items that were assumed rather than written. The table lists the usual places.

ItemThe question to ask
Transport and lift chargesAre delivery and carrying material up included?
Debris removalIs it included, and where does it go?
Wall preparationWho corrects uneven or damaged walls before fitting?
Society requirementsWho pays the deposit and any society charges?
Hardware upgradesIs soft-close, full-extension hardware in the base rate?
Internal fittingsAre drawers, baskets and accessories included or extra?
Design changesWhat does a change after approval cost?
CleaningIs a final clean part of handover?

The cleanest answer to each is a line on the quotation, either priced or marked as excluded. Something that is neither is something that will be discussed later.

How Should Tax and Validity Be Shown?

Tax. The quotation should state clearly whether the rates include tax or whether tax is added to the total. Two quotations that look similar can differ substantially once tax is applied to one and already included in the other. Compare totals on the same basis.

Validity. Material rates move, so most quotations are valid for a limited period. Check how long, and what happens if you sign after it expires or if the project is delayed for reasons on your side.

Rate locks. On a long project, ask whether the rates are fixed for the duration of the work or can be revised. Fixed rates protect you; revisable rates should at least say on what basis they can change.

How Should Changes After Signing Be Handled?

In writing, priced before the work is done. Changes are normal in any interior project: a different finish, an extra drawer, a moved unit. The problem is changes agreed verbally and priced afterwards.

A good quotation says how changes work: you request a change, the firm prices it and states any effect on the timeline, you approve it in writing, and then it is done. This is sometimes called a variation or change order. It protects both sides, because nobody has to remember later what was agreed on site.

Also check what a change costs once manufacturing has started. Factory-made units are cut early, so a change after cutting may mean remaking a part rather than adjusting it.

What Should the Payment Schedule Look Like?

Tied to stages of work you can see, rather than to dates. A typical shape is a booking amount when the design is finalised, a larger payment when production begins, a payment on delivery or installation, and a final amount after the snag list has been closed.

What to watch for is a schedule where most of the money is paid before anything arrives on site, or one where the final payment is due on installation rather than after the snags are fixed. The last payment is your leverage to get the finishing work done properly; it should come after you have checked the work. Our guide to how to tell good woodwork from bad covers what to check before that payment.

What Should You Get in Writing Before Signing?

  • Every unit with its measured size and unit of measurement
  • The specification for each unit, named by brand and model
  • Every "as per actuals" line with its rate and expected range
  • Every provisional allowance with an example of what it buys
  • A written list of exclusions
  • Tax shown clearly as included or added
  • The payment schedule tied to stages, with the final payment after snags
  • How changes are requested, priced and approved
  • The expected timeline and what it depends on

Gunmala Interiors quotes per square foot of the work actually done, measured at a site visit, with each unit, specification and exclusion written out. On a turnkey project the ceiling, painting and electrical work appear as their own lines, so you can see each trade's share.

Frequently Asked Questions

What does "as per actuals" mean in an interior quotation?

It means an item will be charged at whatever it actually costs or measures once the work is done, rather than a fixed amount now. It is reasonable for quantities that genuinely cannot be known in advance, but not for things that can be measured, like wardrobe sizes or kitchen length.

What should I ask about an "as per actuals" line?

Ask why it cannot be fixed now, what rate will apply so only the quantity varies, and what the expected range is. Also ask to be told before that range is exceeded.

What is a provisional sum in an interior quote?

A placeholder amount for something not yet chosen, such as light fittings, handles or a countertop. The final bill adjusts when you make your choice. Ask what the allowance would actually buy, to check it is realistic.

Where do hidden charges usually appear in interior projects?

In small items assumed rather than written: transport and lift charges, debris removal, wall preparation, society deposits, hardware upgrades, internal fittings, design changes and final cleaning. Each should be a priced line or a written exclusion.

How are interior items measured in a quotation?

Per square foot of front area for wardrobes and cabinets, per running foot for kitchen runs and countertops, per unit for items like TV units, and per square foot of floor or ceiling area for false ceilings and painting. Compare quotations only when they use the same method.

Should GST be included in an interior quotation?

The quotation should state clearly whether tax is included in the rates or added on top. Compare two quotations only on the same basis, because the difference can be substantial.

What is a fair payment schedule for interior work?

One tied to visible stages: a booking amount at design sign-off, a payment at production start, a payment on delivery or installation, and a final payment after the snag list is closed. Avoid paying most of the amount before anything reaches site.

How should changes be handled after signing an interior contract?

Each change should be requested, priced with any effect on the timeline, and approved in writing before the work is done. Changes after factory cutting may mean remaking a part, so ask what they cost at that stage.

Key Takeaways

  • Most surprises in an interior project are written into the quotation from the start.
  • Check every unit has a measured size and the same unit of measurement across quotes.
  • "As per actuals" is fair only for quantities that genuinely cannot be measured now.
  • Test every provisional allowance by asking what it would actually buy.
  • Hidden charges sit in small assumed items: make each a line or an exclusion.
  • Tie payments to visible stages, with the last one after the snags are closed.
  • Agree changes in writing, priced, before the work is done.

See what a woodwork quotation must say for the specification lines, or book a site visit for a measured, itemised quotation.

Book a site visit

Tell us about the home and where you are with it. We visit, measure, talk through what each room needs, and quote per square foot of the work actually done.

About this guide. This is general guidance for people planning interiors, not a quotation or a design for your home. Every flat differs in layout, size, builder specification and the choices you make, and all of those change the work involved. Gunmala Interiors prices per square foot of the work actually done, measured during a site visit, so nothing here should be read as a fixed price, a fixed timeline, or a commitment for your home. Material rates and availability also move over time. For a figure you can rely on, book a site visit.