← All Renovation Guides Renovation

Kitchen Renovation in Phases: How to Split the Work Without Paying Twice

Not every kitchen renovation has to happen at once. Spreading the work over months can ease the budget and the disruption, and lets you live with one change before committing to the next. Phasing works when the whole kitchen is decided at the start, even if it is built in parts. Without that, the later phases fight the earlier ones.

Which Parts of a Kitchen Can Be Done Separately?

PhaseCan stand alone?Watch for
Hardware upgrade (hinges, runners)YesMatching new hardware to existing drilling
Wall unit shuttersYesFinish must match the base units later
Base unit shuttersYesSame laminate batch as wall units
CountertopYesSink and hob reconnection
Added units (tall unit, loft)YesSpace reserved in the plan

In What Order Should the Phases Go?

  1. Fix anything structural in the carcass first, or confirm it is sound
  2. Hardware, which improves daily use immediately
  3. Countertop, if it is changing, before new base shutters, so the counter work cannot damage them
  4. Shutters, ideally all in one phase for an exact colour match
  5. Additions such as lofts or tall units

Our guide to checking a kitchen carcass covers the first step.

How Do You Keep Finishes Matched Across Phases?

Laminate, acrylic and paint vary slightly between production batches, so shutters made months apart can look different side by side. Do all shutters in one phase if you can. If not, record the exact product codes, and ask whether the material can be ordered in one batch and stored, or choose a finish where small variation is less visible, such as woodgrain.

What Must Be Decided at the Start, Even If Built Later?

  • The final layout and any added units
  • Shutter finish and handle
  • Counter material and sink and hob models
  • Electrical points for future under-cabinet lights or appliances

Electrical points in particular are cheaper to add once than to chase walls twice.

Does Phasing Cost More?

Somewhat, because each phase has its own visit, protection, transport and set-up. Grouping work that uses the same trade, such as all shutter replacement together, keeps the extra small. Gunmala Interiors prices per square foot of the work actually done in each phase.

Is Phasing Easier to Live With?

Usually. Each phase disrupts the kitchen for less time. Our guide to renovating while living in the flat covers the temporary kitchen and sequencing.

How Should a Phased Kitchen Renovation Be Planned?

One survey, one design and one quotation for the whole kitchen, split into phases with each phase priced separately. That way every phase fits the final kitchen. See our kitchen refacing and hardware and countertop services.

Frequently Asked Questions

Can a kitchen renovation be done in phases?

Yes. Hardware, wall shutters, base shutters, the countertop and added units can each be done separately, as long as the whole kitchen is designed at the start.

What order should kitchen renovation phases follow?

Confirm the carcass, then hardware, then the countertop if changing, then shutters, then additions such as lofts or tall units.

Will shutters done months apart match?

They may not exactly, because finishes vary between batches. Do all shutters in one phase if possible, or record codes and order in one batch.

Does a phased renovation cost more?

Somewhat, because each phase has its own visit, protection and set-up. Grouping same-trade work keeps the extra small.

What should be decided before starting a phased renovation?

The final layout, shutter finish and handles, counter and appliance models, and electrical points for future lights and appliances.

Should the countertop come before or after new shutters?

Usually before new base shutters, so counter work cannot damage them.

Is a phased renovation easier to live with?

Usually, because each phase disrupts the kitchen for less time.

How should a phased kitchen be quoted?

One survey, design and quotation for the whole kitchen, split into separately priced phases.

Key Takeaways

  • Design the whole kitchen first, even if you build it in parts.
  • Confirm the carcass, then hardware, counter, shutters, additions.
  • Do all shutters together for an exact colour match.
  • Add electrical points once, at the start.
  • Group same-trade work to keep phasing costs down.

See our kitchen refacing service, or book a survey.

Book a survey

Tell us what you have and what is bothering you. We survey the site, tell you honestly what can be retained, and quote per square foot of the work actually done.

About this guide. This is general guidance for homeowners, not a quotation. Every home differs in size, condition, material quantity and access, and all of those change the work involved. Gunmala Interiors prices per square foot of the work actually done, measured during a site survey, so nothing here should be read as a fixed price, a fixed timeline, or a commitment for your home. Material rates and availability also move over time. For a figure you can rely on, book a survey.